![]() |
Lower Northwest Interceptor, Sacramento Regional County Sanitation District > > Pipeline Relining,
List of Additional Pipeline Projects: Mokelumne Aqueduct Seismic Upgrade Southern Loop Pipeline Bradshaw Interceptor Section 1&2 – Sacramento Regional County Sanitation District Pipeline Improvement Project – Walnut Creek & San Ramon Valley East Bay Municipal Utility District
|
The San Diego County Water Authority is a regional wholesaler that provides water to more than 3.7 million people in and around San Diego County. The Water Authority’s pipeline relining program, budgeted for more than $780 million, was part of the Water Authority’s multi-billion dollar Capital Improvement Program intended to detect and repair deterioration in more than 80 miles of Prestressed Concrete Cylindrical Pipe (PCCP). Relining has been identified as a faster, more cost-effective alternative to cut and cover replacement of the entire pipeline. In addition, it significantly reduces the impact of construction on local communities through which the aqueduct is routed. The general construction method involves lining the existing pre-stressed concrete cylindrical pipe (PCCP) with steel liner sections that are welded together. Pipe diameters range from 48 inches to 108 inches. This method is estimated to extending the service life of the aqueduct by 50 to 75 years. EPC Consultants provided Construction Management services on 4 of the 5 SDCWA reline projects released to date.
|
|||||||||||||
| Home | | | Team | | | Services | | | Projects | | | News | | | Careers | | | Offices | | | Contact Us |
| © Copyright 2011 EPC Consultants Inc San Francisco CA All Rights Reserved |